https://www.engineeringnews.co.za
Awalé Resources|Côte D'Ivoire|BBM|Odienné|Critical Minerals|Gold Mining|Andrew Chubb
||||
awal-resources|cte-divoire|bbm|odienn|critical-minerals|gold-mining|andrew-chubb

Strong gold mineralisation confirmed at Awalé’s Côte d’Ivoire deposit

20th July 2026

By: Tasneem Bulbulia

Deputy Editor Online

     

Font size: - +

TSX-V-listed Awalé Resources reports that first assay results from deeper drilling at the BBM gold/copper deposit at the Odienné project, in Côte d’Ivoire, confirm that BBM’s high-grade core continues below the current openpit mineral resource and point to an emerging underground component of the deposit.

The two holes reported are the first of a 12-hole programme drilled below and beyond the openpit mineral resource.

The first two holes drilled below the BBM openpit intersected strong gold mineralisation, confirming the deposit continues at depth.

Results include 7 m at 7.21 g/t gold equivalent from 385 m downhole, including 1 m at 43.68 g/t gold equivalent, the highest grade drilled to date at BBM (BBDD-31); and 46 m at 2.35 g/t gold equivalent from 364 m downhole, including 17 m at 3.41 g/t gold equivalent (BBDD-30).

The programme follows BBM’s high-grade core, which is interpreted to have a steeper plunge, to an initial vertical depth of 600 m below surface.

Assays for the remaining ten holes are pending.

“BBM is delivering. The first holes below the openpit hit where we expected and returned the highest gold grade drilled at the deposit to date. This tells us the high-grade core continues at depth and reinforces our belief that the system has more to give.

“With ten more holes from this programme at the lab, we look forward to showing shareholders how BBM grows from here,” says Awalé president and CEO Andrew Chubb.

“There is a lot happening at Odienné and we expect to follow shortly with a separate update on Charger and our 100%-owned exploration ground, including first drilling at Seydou and follow-up at the Fremen discovery,” he adds. 

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (17/07/2026)
17th July 2026 By: Martin Creamer
A video round up of this week’s magazine, highlighting our cover story, features and Business Leader.
Magazine round up | 17 July 2026
17th July 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.11 0.209s - 246pq - 2rq
Subscribe Now