https://www.engineeringnews.co.za
Saturn Metals|Australia|Apollo Hill|Gold Mining|Ian Bamborough|Western Australia|Eastern Goldfields
||||||
saturn-metals|australia|apollo-hill|gold-mining|ian-bamborough|western-australia|eastern-goldfields

Saturn Metals increases single-pit gold resource to almost three-million ounces in WA

Rendering of Apollo Hill mine, in Western Australia

Rendering of Apollo Hill mine, in Western Australia

3rd June 2026

By: Marleny Arnoldi

Online News Editor

     

Font size: - +

ASX-listed Saturn Metals has increased the measured, indicated and inferred gold resource of the Apollo Hill project, in Western Australia's Eastern Goldfields, by more than 590 000 oz to 2.83-million ounces, delivering a 26% overall growth in the mineral resource estimate (MRE) and reinforcing Apollo Hill as one of the largest undeveloped, single openpit gold resources in Australia.

The updated MRE will underpin the Apollo Hill definitive feasibility study and form the basis for an updated ore reserve, both of which are targeted for release later this year.

Saturn confirms that substantial growth potential remains, with the mineralisation on site remaining open in several directions. The company will continue with drilling targeting near-surface and lateral extensions.

Notably, an addition of 350 000 oz to the combined higher-confidence measured and indicated mineral resource classification lifts this portion of the resource to more than 2.19-million ounces, which now represents 77% of the total mineral resource and further derisks the project.

The updated MRE is based on an additional 367 reverse circulation and diamond drill holes totalling 62 385 m, which started in July last year.

For context, Saturn explains that 9.46 oz of gold is being returned, on average, for every meter drilled.

Saturn MD Ian Bamborough says the latest MRE is another outstanding results for the company and marks the eighth consecutive, and now largest, resource update on the project.

"Growing Apollo Hill to 2.83-million ounces while simultaneously increasing confidence in the resource is a significant achievement and further demonstrates the scale and quality of the Apollo Hill gold system. Importantly, the entire mineral resource continues to be estimated within a single, simple, large 'Whittle' pit shell, which demonstrates the potential to deliver a highly efficient mining operation through significant economies of scale and a low stripping ratio," Bamborough emphasises.

 

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Craig Miller Technical Services (CMTS)
Craig Miller Technical Services (CMTS)

CMTS is a leading, well-established EC&I contractor with 37+ years of mining and industrial experience. We execute full-scope EC&I projects with...

VISIT SHOWROOM 
ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.06 0.797s - 154pq - 2rq
Subscribe Now